广州市易测检测技术服务有限公司
18665018367
 
CSA for the daily test description
Release Date: [2017/3/30 16:32:43]    Total read [] Times

CSA for the daily test description
One. For the daily tests based on:

1. Certification Report "FACTORY TESTS" under test project.
   For example: We often see the following reports in the certification testing requirements - "FACTORY TESTS: The equipment at the conclusion of manufacture, before shipment, shall withstand for one min, without breakdown, the application 1000V between live parts and exposed metal parts. As an alternative, potentials 20 percent higher may be applied for one sec. "

2. Related to CSA standards.
   For example: wire and cable for the daily test is based on the CSA Standard C22.2 No.49, C22.2 No.127 and C22.2 No.210.2 and so on.

II. Testing various products for the daily example:

Test item test products factory test equipment required for sampling ratio
Home appliances products
Information Products
Pressure testing of electric tools, etc.
Ground testing 100% TEST
100% TEST pressure tester
Ground Tester
Wire and Cable
 Spark Test
Physical testing

Tensile strength
Pressure test
Conductor resistivity of 100% TEST
SAMPLE TEST
SAMPLE TEST
SAMPLE TEST
SAMPLE TEST spark testers
Screw micrometer
Projector
Electronic Balance
Ruler
Tensile tester
Pressure tester
Multimeter
Power line polarity test
Pressure test
Sudden pull test
Lifting test 100% TEST
SAMPLE TEST
SAMPLE TEST
SAMPLE TEST polarity test equipment
Pressure tester
Sudden pull tester
Lifting equipment
Safety shoes sole hardness
Toe impact test
High ESR test shock 1 / 500
1 / 500
1 / 500 Hardness
Impact Tester
ESR Test
Protective glasses ball impact test
Transmission rate of 1 / 500
1 / 500 Impact Tester
Transmission rate tester
Flush sanitary products, performance test 1 / 500 flush test equipment

Note:
1. Factory testing program limited to the above list;
2. Test example above is for reference only, specific test items to the appropriate CSA certification report shall prevail;
3. SAMPLE TEST means that the CSA certification test reporting requirements in accordance with the corresponding ratio for the test, or that when CSA factory inspection test.

III. Factory test equipment management and calibration:

1. CSA certified plant shall process the application, fill CSA Findings Letter - APPENDIX B "CSA factory test confirmation", and to report the factory test instruments sound like CSA.
2. Factory shall establish the annual "Calibration Plan", provides instrument calibration at least once a year, and the check is based on the standards must be traceable to national standards;
3. Factory test equipment shall be verified on the work, and check labels affixed on the instrument, check expiration time specified.

IV. Test equipment used:

1. Plant should be based on the requirements of CSA to develop appropriate test operating instructions, requiring the testing methods of operation, the sampling ratio and precautions;
2. Factory test equipment should be checked daily function (point inspection) to ensure the normal operation of test equipment, and make point inspection of the records;
3. Plant operating instructions should be in accordance with the test products for testing of CSA, and make the test record.
4. Summary of the above points should be kept the factory inspection and routine factory test records to prepare CSA routine inspection reference.

 

Focus us:
Copyright © EAST NOTICE CERTIFICATION SERVICE All Rights Reserved.
Service
Service
Service